大地资源二中文在线播放_大地资源二中文在线观看官网_大地资源一中文在线观看官网_大地资源中文在线观看官网免费_大地影视资源官网第二页_大地资源二中文在线观看下载

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the 2nd Stage of Northland Viaduct Project

Source:    Date:2013-11-12  

Recently, MBEC won the 2nd Stage of Northland Viaduct Project, the accepted Contract Amount is 173680585.00 yuan and the construction period from September 21st, 2013 to October 31st, 2014. The Shenyang Engineering Company will be responsible for the construction works.

The project locating in Central Business District of Benxi City includes the main bridge in a single-pylon cable-stayed bridge form and the approach adopting RC Cast-in-situ box girder and PC Cast-in-situ box girder. The detailed span arrangement is (32.5+40+30.76) m+ (152+48+42) m+13m, of which the (152+48+42) m constitutes the main bridge. The main beam is in a combined form of steel beam and PC Beam.

up:

next: